Digital Inspection
Digital Inspection
Theatre
Charlestowne 18
Cinema 12
Elk Grove
Fox Lake
Lake
Lindo
Meadowview
North Riverside Mall
Ogden 6
Paramount
Tivoli
Woodstock
York
Auditorium
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Date
/
MM
/
DD
YYYY
Person
First
Last
• Are the server, UPS and switch spaced correctly?
Yes
No
• Do the side doors lock, unlock and work easily?
Yes
No
If no, which one?
Operator Side
Non-Operator Side
N\A
• Is the shroud around the rectifier?
Yes
No
• Is the quad outlet box mounted securely?
Yes
No
• Is the Christie back plate above the switch?
Yes
No
• Are Hot (H) outlets marked?
Yes
No
• Are Switched (S) outlets marked?
Yes
No
• Do you find the long narrow door stored inside the base strapped in place?
Yes
No
If no, did you find the door?
Yes
No
N\A
• Did you find the bigger slotted door?
Yes
No
• Is the rear projector feet clamp in place?
Yes
No
If no, did you find the clamp?
Yes
No
N\A
• Are the 2 sets of projector keys with their tags stored under the top projector cover?
Yes
No
• If no, is there one set or none?
One
None
• Is the eCNA10 fastened securely to the front wall?
Yes
No
• Opening the eCNA10 front panel, is the handy box mounted securely with a cover plate on the outlet?
Yes
No
• Is there an empty shelf in the sound rack for a DVD?
Yes
No
Do you see any other items that need to be addressed?
Make up a set of keys - Christie base doors, Christie top cover, GDC door and memory stick, mount hook on RH side of view port frame and hang keys.
Done
Before leaving, make up 1 set of 3 keys (no memory stick) and hang in key cabinet - mark tag number inside door. Survey key cabinet to see if there are enough spare hooks to hang 1 set of the special projector keys from each projector.
Done
Any other items?